This time, we will repair the formwork joints and repair the haunches. Construction area : 11 ㎡ (fully finished including foundation) Construction time : 1 day Number of…
This time, we have repaired the steps that were created during the concrete casting process. The depth is about 10 to 30 mm at the part where crosspieces…
This time, we repaired the part where there was a difference in level the retaining wall. The situation before construction, ↑One side of the upper part (left) rises…