Category: Different in level

Concrete formwork joint Replacement Repair Work

This time, we will repair the formwork joints and repair the haunches. Construction area : 11 ㎡ (fully finished including foundation) Construction time : 1 day Number of…

Cross section repair and Surface finishing

This time, we have repaired the steps that were created during the concrete casting process. The depth is about 10 to 30 mm at the part where crosspieces…

Repairing the top of a concrete wall with different in level

This time, we repaired the part where there was a difference in level the retaining wall. The situation before construction, ↑One side of the upper part (left) ​​rises…